Submitted by pnavarro on June 12, 2019 - 11:11am
Copy & Print Services' Digital Print Centre (Print Shop) will be closing today (12 June) at 3:30pm
Submitted by smulholland on June 4, 2019 - 9:58am
The building has been closed temporarily, due to construction.
Submitted by pnavarro on June 4, 2019 - 9:18am
Due to building closures the Print Shop will be closed for today (Tuesday 4 June).
Submitted by smulholland on May 30, 2019 - 2:07pm
This summer's Creative City Campus renovations include upgrades to the heating, ventilation and air-conditioning (HVAC) systems, requiring a system shut-down for the north half of the main building.
Submitted by smulholland on May 24, 2019 - 10:44am
The elevators are offline in the Annex Building, a 113 McCaul Street.
Submitted by xye on May 21, 2019 - 2:33pm
Message from the President Regarding Harassment Complaint
Submitted by 3173673 on May 21, 2019 - 9:36am
OCAD University mourns the passing of Christine Crosbie
Submitted by smulholland on May 17, 2019 - 4:00pm
With the initiation of the Creative City Campus renovations to the Fabrication Studios, DRPT Studios and roof work, OCAD U’s contractor Eastern Construction has mobilized on site.
Starting next week (May 21 to 24), hoarding will be constructed in the lobby of the main building to enclose the main area of work. Signage and hardware will be installed at other locations as required. Demolition will begin on Levels 1 and 4, and preparatory work will begin on the roof.
Submitted by smulholland on May 16, 2019 - 5:30pm
If you find the elevator unresponsive, please call Safety & Security Services at 416-977-6000, Ext. 366 to facilitate access.
Submitted by pnavarro on May 9, 2019 - 9:23am
The Print Shop will be shifting to summer hours this Monday 13 May:
8am - 4pm
Monday - Friday
Pages